Se rendre au contenu

Technical Questions?

Thank You For Your Feedback

Our team will message you back as soon as possible.
In the meantime we invite you to visit our website.

Frequently Asked Questions

Nudura forms stay in place to provide insulation value (R24) and vapour protection. Ties are built into each block, reducing labour costs significantly over plywood. Plywood forms require all ties to be installed on the jobsite, and require stripping once the concrete has been poured. Nudura forms fold flat to reduce shipping costs and are lightweight (15 pounds for 12 ft²).
The Nudura block has rigid plastic ties that run the full height of each block and are located 8" on centre. It is easy to attach drywall to the ties using 1-1/4" drywall screws. The pullout strength of a drywall screw is 185 pounds, so there is plenty of holding capacity.
Horizontal rebar is slipped into the block every 18" on centre. Special rebar tabs make positioning a breeze. Vertical rebar is installed from the top, weaving between the horizontals at each block level.
We recommend using the Nudura Peel & Stick membrane. The advantage of the Peel & Stick is that it acts as a slip plane, allowing the soil to slide down the foundation. For details, visit our technical details page.
We recommend attaching the windows to the inside face of the opening. You will need to contact your window manufacturer to ensure they supply flanges designed for this detail. We do not recommend attaching to the outside face of the ICF as this exposes the window to inclement weather. Testing shows that side mounted windows perform significantly better than surface mounted.
Nudura blocks are 18" high and can be cut in half to produce a 9" height. There is also the Optimizer block which is 12" high (or 6" when cut in half). Finally there is the 3" height adjuster. Contact us for a calculator showing how to achieve any wall height.
We have a list of 58 installers in the Greater Vancouver area. We will send your project details to these installers so that they can quote on your project.
There are many ways of aligning the foundation wall with the framing above. Please contact us for details on your specific project.
The area between the ground and the start of the framing is important to protect as the ICF is soft and can be damaged. We recommend attaching a strip of 1/4" Hardiboard using stainless steel screws. The area can also be parged with waterproof stucco over a fiberglass mesh.
This can be achieved in a number of ways. The floor system can be constructed on top of the ICF wall, or it can be attached to the inside face of the ICF wall. Contact us for details on the different options.
We recommend yes. However, according to the 2020 revision to the BC Code, there is no need for the rainscreen and the cladding can be attached directly to the ICF. Contact us for our full discussion on this topic.
No. The Nudura block qualifies as a vapour barrier. Contact us for full technical details.
The Nudura block has rigid plastic ties that run the full height of each block. As they are located 8" on centre, it is easy to attach siding directly to the ties. The pullout strength of a #8 screw is 185 pounds, so there is plenty of holding capacity.